2026 Printable Monthly Project & Quilt Planner Pages

Who’s ready to get organized? (Raises hand!) I’m going to do my part to help you organize your sewing, quilting, and craft projects this year with these printable monthly project planners. Keep yourself on track throughout the year!

planner pages scattered on table with text overlay

(This post has been updated from a previous version)

Like many of you, I sat down at the beginning of the year to “get myself organized.” I’ve been a little off track the last few months and have begun a plan to “right the ship,” for lack of a better term.

We have offered a set of planner pages like this each year for the last five years, and they were so popular that we’ve decided to offer a 2026 version of the pages!

The 2026 version includes NEW cover art and updated calendars.

It is FREE with any purchase over $5 in our shop! There are THREE ways to get the planner this year!

  1. Buy it in the shop for $5
  2. Get it for FREE with any purchase in the shop $5 or over THRU JANUARY 31 ONLY
  3. Join our Patreon Block of the Month

NOTE: Some images in this blog post feature our 2020 or 2021 calendar art, but all downloads will include the updated 2026 art.

Updated Graphics & Layout for 2026

I decided it was time to update the graphics on our 2026 planner pages. I’ve changed the month format and updated and modernized the fonts on the project pages.

The files have also been updated to include all pages in ONE PDF. No more downloading twelve different files! I think this change will make this so much simpler!

Why a Separate Quilter’s Planner?

As I plan the patterns and projects I want to share in the coming year, I begin by making a set of project planners.

First, I break down my monthly goals, then begin making a list of what I need to do.

I have a traditional paper planner. I keep it on my desk to track deadlines and major events; I do not use it as a project planner. I believe it’s better to keep that separate.

For my projects, I prefer to use large notebooks. I like to have lots of room to write and sketch. Since they are so large, I don’t want to carry them around.

I have found that traditional planners are usually too small and don’t have enough “free” space for notes and sketches.

Cute and Clever Sewing Room Organization Ideas; fun ideas for storage and ways to make your sewing space more functional

About the 2026 Monthly Project Planner Pages

Recently, those large notebooks have not been working well for me, as they have become filled with unorganized, random notes and scribbles; for this reason, I have transitioned to a more project-based system.

Since I was designing a set of project planners for myself in the new year, I thought I might as well share them with you, too!

These project planner pages are designed specifically to help you plan, manage & complete your sewing, craft, and quilting projects throughout the year. 

How to Get the Planner Pages

There are three options.

Option One: Get the Free in the Polka Dot Stitch Society on Patreon

The annual Block of the Month quilt is hosted on my Patreon (hop on over there to see the quilt)! The planner is one of our January downloads in the Polka Dot Stitch Society!

Why Patreon?

  • I can upload a video for each block pattern.
  • International quilters can participate.
  • Block pattern PDF’s downloaded in the Patreon – log in and grab the file!
  • Ask lots of questions if you get stuck sewing your blocks!

The 2026 Block of the Month, Heirloom Sparkler!

This year, we will be making this great bear-paw-inspired sampler quilt pattern (70″ x 70″). There are two versions available, and we will have kits for members to purchase if they wish!

Option Two: Free with Purchase

You can get the planner pages for FREE with any sewing or quilting pattern purchase in our shop for OVER $5 THROUGH JANUARY 31ST, 2026 ONLY.

screenshot of polka dot chair pattern shop

VISIT THE SHOP!

You do NOT need a code. The discount is AUTOMATIC! When you check out, the price will be $0 as long as you have $5 or more of other items in your cart.

To use this option, please visit the shop.

Option Three: One-Time Purchase

Purchase them in our shop.

This is not meant to be a FULL planner. As mentioned earlier, I use a traditional planner (I prefer the Simplified Planner by Emily Ley) separately. I prefer the Weekly version.

Outside of the USA?

You can purchase via our Etsy shop if you are outside of the USA. (or join the Patreon for one month, then cancel). There is no way to automatically add the planner pages to purchases over $5 there; message us if you make a purchase, and we will email you the planner pages.

What exactly is in the Printable Monthly Project Planners?

screenshot of all twelve months cover pages in the quilters planner

2026 Cover Art for Each Month!

This is the system I am using for myself. In my role, I have extensive experience planning and executing projects on schedule.

I consistently have to finish projects with set deadlines and have learned how to “get stuff done” over the years. I’m sharing the knowledge I’ve gained from doing that with you.

examples of four types of planner pages included in pattern

The idea behind these planning pages is to print ONE set per month. You can print as many or as few of each specific page as you want. It all just depends on what you’re working on that month.

Page choices include:

  • 2026 Title Page
  • 2026 Dated Monthly Calendar Pages
  • Project Planning Sheet
  • Project List
  • To-Do List
  • Notes & Sketches Page
  • To Buy List
printed out planner pages on white grid cutting mat

NOTE: January 2026 has different cover art (the photo is from 2021)

Each title page includes an exclusive cover design!

planner pages scattered on table with text overlay

This year, I’ve added a small notecard to the cover of our monthly pages. That way, you can also jot down a few thoughts on the cover. I plan to use it to track my “big” projects for that month, so they stay at the forefront.

On the Monthly calendar printable, there is a space at the bottom to list your monthly intention.

How Do I Turn the Loose Pages into a Planner?

flat lay of printed planner pages and calendar with desk supplies on table

Reminder: Art is from the previous version. Please refer to the 2026 graphics photos

You have a few options; you can:

  1. Print them out and put them in a 3-ring binder.
  2. Staple the pages together
  3. Keep the pages paperclipped together and put them in a notebook with pockets
  4. Keep them loose in a plastic envelope.
  5. Sew the pages together to create a “bookbinding.”
  6. Take them to a copy shop and have them spiral-bound. You can also mix and match them with loose-leaf lined paper or graph paper

NOTE: Some images feature our 2020 calendar art, but all of the downloads will contain the updated 2026 art.

planner pages in clear envelope on white table

My favorite way to keep them organized is to use these clear document envelopes. I have twelve —one for each month.

planner pages in clear envelope on white table

Why I Like the Envelope Method

  • I can add additional items to the envelope, such as patterns, pieces, or fabric swatches.
  • If I jot notes down in another notebook, I can slip them into the envelope.
  • If I start another project, I must print another “Project Page” and add it to the envelope.
  • I can keep my receipts organized by month.
  • If I need to take the planner with me, it’s protected.

If you take the pages to a copy shop and have them bound, I recommend using heavy cardstock on the front and back pages to make them more sturdy.

My preferred method is to sew the pages together. I mean, you’ve got a sewing machine, right? Why not use it?

Set your machine to a longer stitch length (e.g., 3.5) and sew along the side. I use binding clips to keep my pages together as I sew.

planner pages scattered on table with text overlay

More Ways to Get Organized This Year:

How to Organize your Fabric Stash

How to Make Printable Stickers for your Planner

Roll Up Sewing Machine Mat Organizer Tutorial

Similar Posts

12 Comments

  1. Melissa, thank you so much for sharing your planner. I’m so excited to use if to get myself oganized. I also ordered the Halloween bundle for the bag pattern. My sister gave me a large cosmetic bag made by her friend. This pattern looks perfect for me to make for my friends. Looking forward to another year of inspiration by you. I’m looking forward to Summer Picnic coming out this summer and doing the quilt along.

  2. thank you so much for sharing the project planner. So excited to start using it. I’m sure that this will make things flow a little easier. Thanks again.

  3. Thank you thank you!!! I love the planner, the design, the idea to help me make a plan, follow it & succeed!! I can’t wait to start.

  4. I can’t find the printable for the January planner page. I’m kind of behind on my project planning. I have all my notes scribbled down on pieces of paper but I want to write them in the January pages. Then I can begin to catch up before March gets here. Could you please tell me where I can download it or send me a link. Thank you so much. I don’t want my yearly by the month planner to start with February!

  5. These are fabulous! Thank you so much. Is January still available? I would like to add some completed projects but cannot find the link to download January.
    Thank you.

    1. Hi, January was removed a few days into February. The pages are just up for the month we are in and the month afterward. There are a lot of dishonest people on the internet and having the entire year up at once would cause problems with copying. I know you are not one of those people but 11 years of blogging has taught me some tough lessons —

  6. Oh, my goodness! I cannot even BEGIN to tell you how happy I am to see this…to know someone else did this, and I don’t have to worry about trying to do it myself! I feel as if I have so many roadblocks preventing me from getting stuff done right now. . .and, here you are just making it so much easier. This is manna from Heaven.

  7. Thank you! I cannot wait to print this and get started. I have so many ideas swirling in my head, it’s time to get this on paper and get going!

  8. Great idea! I’m signing up now. I plan to use a paper clip or perhaps an envelope for the month and sew the pages together at the end of the month. The cover pages are pretty too.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.